Although not necessarily a problem during the load, several of the other 6 issues identified were only found in the Inactive Tasks. In MS Project, a task can be marked as “inactive” which basically tells the scheduling tool to ignore it. We identified 7 potential problems that needed to be resolved in the MS Project schedule before it will load successfully in P6. However, during the testing several projects errored out and would not load. At face value, this is basically a “Save As XML” in MS Project and “Import Microsoft XML” from P6 operation. ERROR TROUBLESHOOTING IMPORTING MS PROJECT SCHEDULES INTO P6 ORACLE PRIMAVERA P6 DOWNLOAD THE PDF HEREĪ recent client required several hundred Microsoft Project schedules to be migrated to Primavera P6.